S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
245. The authorization holder must, if the measurements may be carried out without risk to the integrity of the well, measure the shut-in pressures in all annular spaces and in the production tubing.
O.C. 1251-2018, s. 245.
In force: 2018-09-20
245. The authorization holder must, if the measurements may be carried out without risk to the integrity of the well, measure the shut-in pressures in all annular spaces and in the production tubing.
O.C. 1251-2018, s. 245.